Construction Tracking App

Your Home Building Journey, In Your Hands

NEXTRACK keeps you informed at every step — from planning to completion. Track your progress, view updates, and build with confidence.

How it works ↓

Plan

Your dream. Our plan.

Build

Quality at every step.

Track

Real-time updates.

Complete

Your home, delivered.

0Construction activities tracked
0Quality checkpoints per house
0monthsTypical plan: grey + finishing
0Finishing packages to choose from

Real-Time Updates

Know what's happening, when it's happening.

Transparent Process

No surprises. Just progress.

Direct Communication

Stay connected with your construction team.

Access Anytime

Track from anywhere, on any device.

From Foundation
to Family ♡
Our Services

Build your home your way

Start with a strong grey structure, or hand us the complete job. Either way, every stage is planned, checked and visible to you.

Phase 1 · about 6 months

Grey Structure

Foundation, RCC frame, brick masonry, concealed electrical & plumbing, plaster and waterproofing, built to drawing and checked at every pour.

  • Foundation & plinth
  • Columns, beams & slabs
  • Masonry
  • Conduiting & plumbing
  • Plaster
See the grey structure plan ›
Grey + finishing · about 12 months

Complete Construction

Everything in Grey Structure plus tiling, doors & windows, ceilings, paint, fixtures and external works, handed over ready to move in.

  • Tiles & flooring
  • Doors & windows
  • False ceiling
  • Paint & polish
  • Fixtures & handover
Calculate your cost ›

Everything about your house, in one place

Sign in to use NEXTRACK's AI assistant and project tools.

Calculate Your Budget

Package-wise cost estimates for your plot size, city and floors.

Track Real-Time Budget

Monitor actual spending against your estimate as you build.

Quality Checklists

25 activity checklists, signed off by your site engineer and manager.

Project Timeline

Grey structure and finishing schedules with live progress and delays.

Quality Assurance
0+

Quality checkpoints, signed off at every stage

Each of the 25 construction activities has its own checklist. The site engineer fills it in, the construction manager verifies it, and you see the status in real time.

  • Checked before every concrete pour: steel, cover, shuttering and levels
  • Pressure tests, flood tests and hollowness tests recorded
  • Finishes matched against your approved finishing book
  • Printable, signed checklists kept for your records
0

Foundation checks

Layout, excavation, PCC, footing steel, concreting and plinth.

0

Structure & MEP checks

Columns, slabs, masonry, concealed electrical and plumbing.

0

Finishing checks

Waterproofing, plaster, tiles, doors, ceiling, paint and fixtures.

0

Documents & handover

Drawings, finishing book, snag list, keys and as-built records.

Project Timeline

Your house in two clear phases

A typical house is planned as 6 months of grey structure and 6 months of finishing. Your own timeline updates live as work is completed.

M1M2M3M4M5M6M7M8M9M10M11M12
Grey StructurePhase 1
6 months
Foundation & plinthDrawings, excavation, footings
Month 1–2.5
Frame & masonryColumns, slabs, brickwork
Month 3–5
MEP & plasterConduits, plumbing, plaster
M5–6
FinishingPhase 2
6 months
Tiles, doors & ceilingFlooring, frames, ceilings
Month 7–9
Paint, fixtures & handoverFinal finishes, snagging
Month 9–12

Every activity shows its planned and actual dates side by side, so any delay is visible the day it happens, not at the end.

Why NEXTRACK

Built on five simple promises

Home construction shouldn't be a guessing game. Here is what you can count on from day one.

Clear Estimates

Package-wise, per-sqft pricing for your city, plot size and floors before you commit.

Quality at Every Step

145 checkpoints across 25 activities, verified by the construction manager.

Real-Time Progress

A live schedule with planned vs actual dates and the critical path highlighted.

Direct Communication

Ask anything about your project and get answers from your construction team.

Complete Records

Drawings, checklists, dates and sign-offs kept together in one place.

Packages

Transparent per-sqft pricing

Indicative construction rates. Your final cost depends on city, plot size, floors and site conditions. Use the calculator for a floor-wise estimate.

Basic

Economy-grade, move-in ready
Rs 3,100 / sqft
  • Cement: Local / DG / Fauji
  • Tiles: Local budget tiles
  • Paint: Economy emulsion
  • Sanitary: Economy grade
Calculate cost
Most Chosen

Standard

Trusted brands, best value
Rs 3,650 / sqft
  • Cement: Lucky / Bestway
  • Tiles: Master Tiles
  • Paint: ICI Dulux Weathershield
  • Sanitary: Sonex / Master
Calculate cost

Premium

Upgraded finishes throughout
Rs 4,650 / sqft
  • Cement: Lucky / DG Premium
  • Tiles: Diamond / Imported
  • Paint: ICI Dulux Velvet Touch
  • Sanitary: Master / Porta
Calculate cost

Luxury

Imported and top-tier materials
Rs 6,200 / sqft
  • Cement: Lucky Platinum grade
  • Tiles: Imported marble / porcelain
  • Paint: Berger Luxury / Textured
  • Sanitary: Imported
Calculate cost

Rates vary by city and site conditions. Land cost, approvals and utility connections are not included.

Where we build

Building better, city by city

City-level material and labour rates are built into every estimate.

📍
KarachiSindh
📍
LahorePunjab
📍
IslamabadCapital Territory
📍
RawalpindiPunjab
📍
FaisalabadPunjab
📍
MultanPunjab
📍
PeshawarKhyber Pakhtunkhwa
+
Other citiesAsk us about your area
Always with you

Your home, always in sight

Check progress from the site, the office or abroad. NEXTRACK works in the browser on any phone, tablet or computer, with no download needed.

Live progress & delays
Quality checklists
Budget vs actual spend
AI construction assistant
FAQ

Frequently asked questions

NEXTRACK is an AI-powered home construction assistant. It helps you estimate your budget, follow your project's schedule, and see the quality checks done at every stage of building your house.

Sign in and open the Project Timeline. It shows the grey structure and finishing phases separately, with planned and actual dates for every activity, the overall % complete, and any delay in days.

Each of the 25 construction activities, from site handover to final handover, has a checklist with 145 checkpoints in total. The site engineer fills it in and the construction manager checks it. Every checklist can be printed for signatures.

The cost calculator uses your plot size, city, number of floors and finishing package to give a floor-wise and stage-wise estimate. It is an indicative figure; soil, design and site conditions can change the final cost.

A typical house is planned as about 6 months of grey structure and 6 months of finishing. The exact time depends on the size of the house, approvals, weather and material availability. Your own timeline updates as work progresses.

Yes. NEXTRACK runs in the web browser, so it works on any phone, tablet or computer without installing anything.

Get in touch

Planning to build? Let's talk.

Tell us about your plot and what you'd like to build. Our team will get back to you with next steps and an estimate.

CitiesKarachi, Lahore, Islamabad, Rawalpindi, Faisalabad, Multan, Peshawar

Request a free consultation

It takes less than a minute.

Thank you! Your email app has opened with your details. Just press send and we'll be in touch.